Professional Design Tpco ASTM A53 A106 Gr. B A179 A192 A333 Carbon Seamless Steel Pipe

Short Description:


Product Detail

Product Tags

We pursue the management tenet of “Quality is superior, Service is supreme, Reputation is first”, and will sincerely create and share success with all clients for Professional Design Tpco ASTM A53 A106 Gr. B A179 A192 A333 Carbon Seamless Steel Pipe, We’ve been honest and open up. We glance ahead on your pay a visit to and developing trustworthy and long-term standing relationship.
We pursue the management tenet of “Quality is superior, Service is supreme, Reputation is first”, and will sincerely create and share success with all clients for Boiler Tube and Steel Tube, Our products are produced with the best raw materials. Every moment, we constantly improve the production programme. In order to ensure better quality and service, we have been focusing on the production process. We have got high praise by partner. We are looking forward to establishing business relationship with you.

Grade

C(%)

Si(%)

Mn(%)

Cr(%)

Ti(%)

20CrMnTi

0.17-0.23

0.17-0.37

0.80-1.10

1.00-1.30

0.04-0.10

Grade

Rp0.2 (MPa)

Rm (MPa)

Impact

Elongation

A Z (%)

Delivery

Hardness HB

 

 

 

KV (J)

A (%)

 

 

 

20CrMnTi

318 (≥)

967 (≥)

11

34

41

Solution & Aging, Ann, Ausaging, Q+T

332

1. Incoming Raw Material Inspection

2. Raw Material Segregation to avoid steel grade mix-up

3. Heating and Hammering End for Cold Drawing

4. Cold Drawing or Cold Rolling, On line inspection

5. Heat Treatment

6. Straightening/Cutting to specified length/Finished Measuring Inspection

7. Quality Testing in own lab with Tensile Strength, Yield Strength, Elongation, Hardness, Straightness, etc.

8. Packing and Stocking.

100% Eddy Current Testing.

100% Size Tolerance Checking.

100% Tube surface checking to avoid surface defects

Hot Rolled, Annealed, Normalized, Quenched and Tempered

Packaging

1. Bundle packing

2. Beveled end or plain end or varnished as per buyer’s required

3. Marking: as per customer’s requests

4. Painting varnish coating on the pipe

5. Plastic caps at ends

Delivery time

With 15-30 days after full payment received

We pursue the management tenet of “Quality is superior, Service is supreme, Reputation is first”, and will sincerely create and share success with all clients for Professional Design Tpco ASTM A53 A106 Gr. B A179 A192 A333 Carbon Seamless Steel Pipe, We’ve been honest and open up. We glance ahead on your pay a visit to and developing trustworthy and long-term standing relationship.
Professional Design Boiler Tube and Steel Tube, Our products are produced with the best raw materials. Every moment, we constantly improve the production programme. In order to ensure better quality and service, we have been focusing on the production process. We have got high praise by partner. We are looking forward to establishing business relationship with you.


  • Previous:
  • Next:

  • Related Products